    Yes. Basketball court tiles over concrete is the most common way a Game Tile Courts™ court goes down, because concrete is the ideal subfloor for modular sport tile. If you already have a sound concrete pad, driveway or patio, the base is done and the tile is the easy part. Here's what your slab needs and how the install works.

    Concrete Requirements

    Your concrete pad should be:

    • Structurally sound (no cracks wider than 1/2 inch)
    • Reasonably level (within 3/8 inch across 10 feet)
    • Clean and free of grease or oil
    • Large enough to leave a 3/4-inch expansion gap around the tile perimeter

    Pouring a new slab instead? Our guide to building a concrete basketball court base covers thickness, control joints and slope, and a new slab needs a minimum 28-day cure before tile goes down. Base work is quoted separately by a licensed local contractor.

    The Install Process on an Existing Slab

    1. Clean the pad with a hose and let it dry completely
    2. Snap your first tile in a corner, female edge facing away from the wall
    3. Interlock tiles row by row in a perpendicular pattern
    4. Trim edge tiles with a jigsaw or utility knife to fit
    5. Snap edge pieces and ramp borders around the perimeter

    Total install time for a 40 × 60 ft court: 6-10 hours for two people.

    The tiles are not glued to the slab. The field floats, and only one edge is secured with concrete screws so the surface can expand and contract with the seasons. Our guide to anchoring court tiles shows which edge to fasten and how to hide the screws under the transition ramps.

    What If My Concrete Is Cracked?

    Hairline cracks (under 1/4 inch) are fine - the tile spans them. Cracks wider than 1/2 inch should be filled with a concrete patching compound before install to prevent tile edges from catching.

    Not sure which side of that line your slab is on? Send photos for a free CAD layout and our team will look at the pad along with your measurements.

    Can I Install Over Asphalt?

    Yes. The same rules apply: structurally sound, reasonably level, clean surface. Asphalt is the second most common subfloor after concrete. New asphalt needs at least 30 days to cure before tile, longer in cool weather.

    Frequently Asked Questions

    Q: Can you put court tiles on an existing concrete basketball court?

    A: Yes. An existing concrete court that is structurally sound, reasonably level and drains well is the ideal base. The tiles snap together on top of the slab, cover the old painted lines and add cushion that bare concrete does not have.

    Q: Do sport tiles cover cracks in concrete?

    A: Hairline cracks under 1/4 inch are fine, because the tile spans them. Cracks wider than 1/2 inch should be filled with a concrete patching compound before install so tile edges do not catch. Tile hides small cracks, it does not repair a failing slab.

    Q: Do I need to glue the tiles to the concrete?

    A: No. Game Tile Courts™ tiles interlock without adhesive, making them removable and rearrangeable.

    Q: Will the tiles scratch or damage my concrete?

    A: No. The ribbed underside sits on the concrete without bonding to it.

    Q: Can sport tile go on a sloped driveway?

    A: Slight slopes (up to 1%) are fine for drainage. Steeper slopes need a leveling layer first - request a free site assessment.

    Ready to Build?

    Get a personalized estimate and a free Court CAD layout from our team.

    Free Resource

    Get the Backyard Court Playbook - Free

    Court sizing tips, tile care, and pricing guides - straight to your inbox. No spam, just useful intel for planning your build.

    We respect your inbox. Unsubscribe anytime.